§ 20-93. Inspection and approval prerequisite to connection to existing system.  


Latest version.
  • Actual interconnection of an extension with the existing city water or sewer system shall be prevented by omitting a connecting section or by placing a temporary bulkhead in the connecting lines until the extension project has been fully inspected and approved and all other conditions for extension of service have been met.

(Ord. No. 81-29, § 1(20-70), 9-22-81)